Big Look task force Regulation and Enforcement
Intelligent Urban Design
Big Boxes or Local Businesses
Block Planning
Reusing Parking Lots
Billboards Bans
Dark Sky laws: Light Pollution
EWEB's relocation to wetlands
solar power on every roof
wind turbines on the coast
wave energy and tidal power
methane biogas
algae (non-GMO?)
conservation, the first priority
Liquid Natural Gas - a new danger
Bio & Myco-Remediation
Waste is a Terrible Thing to Mind
Union Pacific Railyards
Grass Seed Smoke
forest slash burning, plastic tarps
Formaldehyde from Plywood
Nanotechnology
Herbicides and Pesticides
"When politics enter into municipal government, nothing resulting therefrom in the way of crimes and infamies is then incredible. It actually enables one to accept and believe the impossible..."
-- Mark Twain, letter to Jules Hart, 12/17/1901
SustainEugene.org does not use "cookies" or other spyware to track visitors
to contact this website: mark at permatopia dot com
A Damn Big Problem Aging Dams and the Willamette Valley Tsunami
Perhaps the most serious disaster threat faced by the Eugene area is the potential for catastrophic failure of dams during a large flood or earthquake. The only disaster that would be worse is some sort of national or global cataclysm (nuclear war or pandemic), scenarios that would not be limited to our region.
If a 40 foot wall of water swept through the Eugene - Springfield area, the aftermath would resemble a mix of the inundation zones from the 2004 Indian Ocean tsunami and the impact of Hurricane Katrina upon the City of New Orleans. If the dam failures would caused by a large earthquake, it is likely that this would be the end of the Eugene metropolitan region. The combination of bridge collapses, destruction of many buildings and the sudden, severe flood from the dam failures would make the area "resemble Hiroshima" -- as one City Councilor has privately expressed.
At a minimum, emergency response and awareness of these threats are desperately needed. Inundation maps need to be made public so that citizens would know how far - and which directions - to flee in the event of disaster. The State of Oregon posts tsunami inundation maps for coastal communities on its website, and posts signs on Highway 101 to indicate the danger zones. There is no technical, legal, political, financial or security excuse to keep similar information secret from the taxpayers of Eugene, Springfield and nearby communities -- since this knowledge would be the most important factor for minimizing casualties should this event occur. How far away from the river people would have to go is unknown to the average person. Would vertical evacuation in downtown Eugene be sufficient (going to the top of a parking garage or one of the taller buildings)? Widespread awareness of these facts could spur regional and federal government actions to address the problems by either strengthening or removing the dangerous dams.
The City of Eugene "multi hazard mitigation" discusses the dangers of nine dams -- Cottage Grove, Dexter, Fall Creek, Dorena, Lookout Point, Blue River, Hills Creek, Cougar, Fern Ridge. Three of them had no seismic considerations when built (Cottage Grove, Dorena, Fern Ridge). The others had some seismic concerns in the design, but that was before the threat of the Cascadia Subduction Zone was fully understood. A large Valley earthquake (Richter 7?) or a Subduction Zone event off the coast (Richter 9) could breach some, if not all of the dams.
According to the Multi-Hazard report, a failure of Lookout Point (upstream of Dexter) would require the evacuation of over 250,000 people with damages in excess of $10 billion.
Rep. De Fazio was asked about this September 19, 2005 at his town hall meeting, and he didn't want to deal with it. He just said that removing the dams was not practical (due to "developed" low lying areas) and refused to discuss the need to strengthen them.
Lookout Point (the large dam just upstream from Dexter, visible from Highway 58) is the largest reservoir in the entire Willamette River system. It is also next to a (possibly inactive?) earthquake fault.
The report does not estimate the money that would be required to strengthen (or dismantle) these dangerous dams, but the price tag probably has lots of zeros in it. But the federal empire is too busy destroying other countries to worry about such matters (and Eugene didn't vote for the dictator anyway). One Trident submarine or a couple of days of the Iraq occupation would probably cover the full cost of the repairs, but Halliburton and Lockheed Martin would not be able to reap obscene profits, so there are no plans to fix them anytime soon.
Hills Creek dam (photo from Army Corps of Engineers)
www.eugeneweekly.com/2005/12/15/news.html
Back on Oct. 13 in this column we wrote about the nearly three dozen "high potential hazard" dams in Lane County, all but one upriver from Eugene and Springfield. Dam failure from a major earthquake could bring catastrophic flooding. This past week we got a delayed response from Randy Prince who has served on a state advisory committee looking at such risks. He tells us no seismic upgrades are happening to Oregon dams, and money is being diverted away from even evaluating these dams. "Inundation maps for a disaster are secret," he adds, and the secrecy is heightened since 9/11. He notes that geology professor Ray Weldon at City Club estimated a major earthquake risk of 2 to 5 percent, but that "applies to each building in our area, not the chance of having an earthquake in our area that causes damage. Poorly sited or under-designed facilities are the ones that will fail when the 100 percent certain big quake happens." Prince says he's worried about local hospitals building new facilities along rivers and within inundation zones. We share his concerns.
http://oilbeseeingyou.blogspot.com/2007/07/post-peak-dam-maintenance-or-lack.html
Tuesday, July 31, 2007
Post Peak Dam Maintenance, or Lack Thereof
"Dam failures are of particular concern because the failure of a large dam has the potential to cause more death and destruction than the failure of any other man-made structure. This is because of the destructive power of the flood wave that would be released by the sudden collapse of a large dam."[2] What will be the fate of the world's large dams after peak oil as energy declines, technology falters and budgets for inspection and maintenance of these critical and dangerous facilities begin to be pared back in deference to perceived more immediate societal priorities?
from
Eugene's Multi-Hazard Mitigation Plan
on the City of Eugene website
This NID (National Inventory of Dams) potential hazard classification is solely
a measure of the probable impacts if a dam fails. Thus, a dam classified as
High Potential Hazard does not mean that the dam is unsafe or likely to fail.
The level of risk (probability of failure) of a given dam is not even considered
in this classification scheme. Rather, the High Potential Hazard classification
simply means that there are people at risk downstream from the dam in the inundation
area, if the dam were to fail. ...
Table 12.3 NID High Potential Hazard Dams
Lane County
County
Dam Name
River
City
NID Height (feet)
NID Storage (acre feet)
Lane
Cottage Grove
Coast Fork Willamette River
COTTAGE GROVE
103
50,000
Lane
Dexter
Middle Fork Willamette River
EUGENE
117
29,900
Lane
Fall Creek
Fall Creek
SPRINGFIELD
205
125,000
Lane
Dorena
Row River
COTTAGE GROVE
154
131,000
Lane
Lookout Point
Middle Fork Willamette River
EUGENE
276
477,700
Lane
Blue River Dam
Blue River
SPRINGFIELD
312
89,000
Lane
Hills Creek
Middle Fork Willamette River
OAKRIDGE
341
356,000
Lane
Cougar
South Fork McKenzie River
SPRINGFIELD
519
219,000
Lane
Fern Ridge
Long Tom River
EUGENE
49
121,000
Of these NID High Potential Hazard dams all except Fern Ridge are upstream
from the Eugene/ Springfield Metro Area.
12.4 Dam Failure Hazard Assessment: Eugene/Springfield Metro Area
A 1987 report on Dam/Levee Failure by the Oregon Emergency Management Division
lists 51 historical dam failures in Oregon from 1896 through the 1980s. As of
the time of this report, no dam failure fatalities had been recorded in Oregon.
However, the potential for dam failure fatalities certainly exists in Oregon,
in Lane County and in the Eugene/Springfield Metro Area, albeit with a low probability
of occurrence.
To evaluate the level of risk posed by the dams affecting the Eugene/Springfield
Metro Area, we consider the nine dams in the NID high potential hazard classification
where the potential impacts of failure, including life safety, are greatest.
Much smaller dams in the significant and low potential hazard categories do
not pose a life safety threat and the risk of property damage is minimal or
low.
12.5.1 Flood Damage to Dams
All of the Corps dams were designed and built with specific flood capacities.
Current dam designs are based on Standard Project Floods. Standard Project Floods,
as defined in the Corps Engineer Manual 1110-2-1411 (March 1, 1965) are floods
resulting from the Standard Project Storm. In turn, the Standard Project Storm
is defined, somewhat imprecisely, as the most severe flood-producing rainfall-snowmelt,
depth-area-duration event that is considered “reasonably characteristic”
of the drainage basin. Discussions with Corps staff in the Portland District
Office indicated that the Standard Project Flood is approximately a 500-year
flood event.
The Corp dams’ discharge design levels include the combination of spillway
discharge capacity and reservoir outlet pipe discharge capacity. For example,
for the Hills Creek Dam, the Standard Project Flood is 64,500 cubic feet per
second. The maximum controlled discharge capacity of the dam is 151,760 cubic
feet per second, or nearly two and one-half times the Standard Project Flood
discharge. These data are included on the Hills Creek Project, Emergency Response
Flowchart7. At discharges beyond the maximum controlled discharge capacity of
the dam, the dam would be overtopped, discharges would be uncontrolled, and
there would be a high probability of damage to the dam, with some potential
for dam failure. The large margin of safety in the discharge capacity of the
dam suggests that the Hills Creek Dam likely has the capacity to withstand floods
at least as large as a 1,000 year flood event without expected damage. The other
Corps dams have similar margins of flood design safety.
12.5.2 Earthquake Damage to Dams
All of these dams were designed and built in the 1940s to 1960s. Seismic design
considerations were thus significantly lower than current seismic design considerations.
A summary tabulation of the seismic design basis and inspection history of these
dams is given below in Table 12.5 (Corps of Engineers, Portland District Office,
March, 2001).
Table 12.5
Seismic Design, Evaluation and Inspection Data
Corps of Engineers Dams
Dam
Date of Last Seismic Evaluation
Seismic Design Basis
Date of Last Periodic Inspection
Original
Current
Cottage Grove
1981
None
0.21 g
1997
Dexter
1981
0.10 g
0.21 g
1996
Fall Creek
1981
0.10 g
0.21 g
1999
Dorena
1981
none
0.21 g
1997
Lookout Point
1981
0.10 g
0.21 g
1999
Blue River
1994
0.10 g
0.24 g
1996
Hills Creek
2000
0.10 g
0.22 g
1999
Cougar
1994
0.10 g
0.24 g
1997
Fern Ridge
2001
none
0.35 g
2000
As shown in Table 12.6, the Corps has conducted at least preliminary seismic
evaluations of all of these dams. However, some of these evaluations were conducted
in the 1980s and thus do not reflect current understanding of the seismic hazard
in Oregon or current state-of-the-art seismic evaluation engineering principles.
The Corps has an ongoing regular inspection program and an ongoing seismic evaluation
program. Presumably, updated seismic evaluations of these dams will be completed
over the next few years.
Seismic considerations were completely absent in the design of two
of these dams: Dorena and Fern Ridge. The others were explicitly designed
or probably designed to ground shaking levels of 0.10 g, which is the maximum
seismic design level for any of the Corps dams in western Oregon. In contrast,
the current Corps seismic design levels for dams at these sites (i.e., if new
dams were to be built today) would be 0.21 g to 0.24g for the dams in eastern
Lane County and 0.35 g for Fern Ridge . Thus, current seismic design
requirements are for levels of ground shaking about two times higher than the
probable design levels for most of these dams and about three times higher for
Fern Ridge.
Seismic evaluations of dam safety are a highly technical, highly specialized
art. Separate evaluations must be done for each dam. The evaluation requires
a detailed analysis of the design and construction of the dam, an analysis of
the current condition of materials and components, geotechnical analysis of
the foundation and site, and a site-specific seismic hazard analysis. For emergency
planning purposes, a seismic evaluation should include the probabilities
of failure for a scenario earthquake such as a large magnitude event on the
Cascadia Subduction Zone.
12.5.3 Loss Estimates (Preliminary)
Detailed loss estimates for possible failures of these dams are beyond the
scope of this mitigation plan. However, we note that in 1987 the Oregon Emergency
Management Division estimated that a completely catastrophic failure
of the Hills Creek Dam, an extremely unlikely event, could require the evacuation
of over 250,000 people with damages in excess of $10 billion. Adjusting
these 1987 estimates for inflation and for population growth suggests that damages
could easily exceed $20 billion. Detailed casualty estimates have not been made
for catastrophic dam failures affecting Lane County. However, given
the large inundation areas, high water depths, and the logistical difficulties
in evacuating 250,000 people to safe ground, it is not difficult to imagine
that a truly catastrophic dam failure could potentially result in 1,000 or more
deaths.
The probability of catastrophic failure of these dams is impossible to estimate
with any accuracy, from present data. Most likely, the probability is less than
0.1% per year (less than once in 1,000 years, on average) and perhaps substantially
less. However, the consequences of failure are so high that careful evaluation
is certainly warranted.
The potential impacts of dam failures on the Eugene/Springfield Metro Area
are summarized below in Table 12.6
Table 12.6
Potential Impacts of Dam Failures on the Eugene/Springfield Metro Area
Inventory
Probable Impacts
Portion of Eugene/Springfield Metro Area affected
Direct impacts limited to mapped inundation areas for dam
failures, or to smaller areas for more likely partial failures
Buildings
Heavy damage in inundation areas
Streets within Metro Area
Damage and closures in inundation areas
Roads to/from Metro Area
Damage and closures in inundation areas
Electric power
Damage and loss of service in inundation areas
Other Utilities
Damage and loss of service in inundation areas. Potential
for major damage to water and wastewater treatment plants in extreme events
Casualties
Potential for high casualties (deaths and injuries) in extremely
unlikely major dam failures, depending on warning time available and effectiveness
of evacuations
12.6 Mitigation Strategies
Possible dam failures affecting the Eugene/Springfield Metro Area are low
probability events, but the potential casualties and economic consequences are
extremely high. The combination of low probability but large consequences makes
analysis of such situations difficult from both a technical and a public policy
perspective. The evaluation is difficult technically because it requires detailed
engineering analysis of each dam and careful probabilistic risk analysis. As
always, communication with the public must be non-alarmist, but factual, realistic
and informative.
Recommendations
1. Because of the age of these dams, the seismic design basis of all of the
dams potentially affecting the Eugene/Springfield Metro Area is significantly
below current seismic design requirements. Preliminary seismic evaluations have
been done but without sufficient detail to evaluate the probabilities of dam
failures. Because of the extreme consequences of potential failure of one or
more of these dams, we recommend that detailed seismic evaluations be
conducted for all of these dams. All of these dams are owned and operated
by the U.S. Army Corps of Engineers. Therefore, pragmatically, the role
of the Eugene/Springfield community would be primarily to strongly encourage
the Corps of Engineers to complete these urgently required seismic evaluations as soon as possible.
2. A key step in mitigation planning for dam safety is emergency planning.
Emergency planners in the Eugene/Springfield Metro Area should obtain copies
of the inundation maps for each of the major dams to familiarize themselves
with the areas of potential flooding. For emergency planning, the estimated
flood depths and the time periods from dam failure are particularly important.
Flood depths and flood times both vary markedly with distance downstream from
the dam locations. For emergency planning, key elements include community emergency
notification procedures and evacuation planning (routes and traffic control).
Because of the very large numbers of potential evacuees, training seminars and
scenario exercises are strongly recommended.
3. All of these dams have Emergency Action Plans. These plans should be reviewed
to ensure that they are complete and up to date. Emergency planning officials
in each county should be fully informed of the detailed consequences of the
potential failure of each dam. Public notification and evacuation plans should
be updated and tested. For some types of dam failures, for example, those due
to extreme floods, there may be some warning time. Decision making procedures,
protocols, and procedures for issuing watches, warnings, and evacuation notices
should be reviewed and updated and coordinated among all responsible federal,
state, and local agencies. [emphases added]
PROBLEM DAMS ON THE RISE IN US
Pennsylvania has seen a fivefold increase in deficient dams since 1999.
By Mark Clayton | Staff writer of The Christian Science Monitor
from the September 13, 2007 edition
The Kaloko dam in Hawaii stood 116 years – until last year when it collapsed after heavy rains, killing seven.
Potential disaster was averted in April in Hollis, N.H., when a dozen families were evacuated and engineers made a controlled breach of an old pond dam to keep it from failing .
Such incidents are warning signs that many of the nation's more than 87,000 dams are in need of repair. Last month's high-profile collapse of the I-35 bridge in Minneapolis focused America's attention on bridge problems. The nation's dams are worse off.
In 2005, the last time the American Society of Civil Engineers rated America's infrastructure, bridges received a "C" grade; dams earned a "D."
Even that rating may be generous, a Monitor analysis of dam-inspection data shows. Since 1999, the number of "high-hazard" dams rated "deficient" has more than doubled, according to data from the Association of State Dam Safety Officials (ASDSO) in Lexington, Ky. High-hazard dams are those whose failures could cause fatalities. In 1999, the US had 546 such dams rated deficient. By last year, it had 1,333.
A second category of "significant-hazard" dams (so-called because they threaten substantial property loss) saw a rise from 339 to 949 deficient dams over the same period. In all, 2.6 percent of the nation's dams are deficient, according to the ASDSO.
"The growth of deficient high-hazard dams in this country is a major issue," says Brad Larossi, legislative chairman for the ASDSO, which represents dam-safety inspectors in all states. "The trend is rising at such a steep slope, much faster than states can do [dam] rehabilitation. Without question the overall trends are clear."
Several factors are behind the rise. Old dams continue to deteriorate or may fail suddenly because of inadequate spillways and trees growing on dams. Many states don't have enough dam engineers to keep up proper maintenance, causing the repair backlog to grow. And as more homes and businesses are built closer to dams, the hazards increase, a phenomenon dam-safety experts call "hazard creep."
Some experts claim that some of the rise is due to better reporting, an encouraging sign. "To be frank, there's been in the past a reluctance in some quarters to identify too many dams as deficient," says Mark Ogden, administrator for dam-safety engineering at the Ohio Department of Natural Resources in Columbus. "But there's also been a strong effort by our association to increase awareness of this problem. We all are realizing we need an honest assessment."
Some states are seeing a faster rise in deficient dams than others. Pennsylvania leads the pack with 215 deficient high-hazard dams, 172 more than in 1999. Not far behind is Ohio, with an increase of 158 . Other states, such as Colorado, New Jersey, and California have seen declines. Some of that is due to better funding, experts say. All three have boosted dam budgets by a third or more since 1999.
Those increases are in contrast to federal dam spending. The nation's dam-safety program, which helps fund safety inspector and engineer training, has not been fully funded in at least five years, Mr. Larossi says. Actual funding is about $5.9 million, well below the $9 million budgeted, he says.
As a result, the number of full-time inspectors has not increased since 1997 (excluding Florida, which claims to have hired 45 inspectors). That leaves each inspector responsible for about 195 dams on average; the ASDSO recommends no more than 50.
"We have seen increased awareness over the importance of adequate funding for state inspectors, but these offices are still understaffed," says Stephanie Lindloff, of American Rivers, an environmental group.
The enormous US dam problem no one is talking about
By Gaylord Shaw
Christian Science Monitor
January 3, 2006
DUNCAN, OKLA. - The landscape of America, at last count, is dotted with
79,272 large dams. Most of them safely deliver bountiful benefits - trillions
of gallons of water for drinking, irrigation, and industrial use, plus flood
control, recreation, hydroelectric power, and navigation.
That's the good news.
Here, in my opinion, is the bad news: Disaster lurks in thousands of those
dams.
At least 3,500 of America's big dams are unsafe, according to inspection reports
filed away in obscure nooks and crannies of government offices across the
country. Thousands more dams also are unsafe, the American Society of Civil
Engineers concluded this year, but no one knows for certain how many because
few states have the funds for even cursory safety inspections.
Thus, every moment of every day, unsafe dams form a vast reservoir of danger
throughout America. That's not an overstatement. I'm not a professional engineer,
but I've spent nearly two-thirds of my 45-year career in journalism studying
unsafe dams. I've done on-the-scene reporting on dam failures that killed
175 people and caused billions of dollars in property damage. I've interviewed
scores of victims, dozens of state and federal engineers, inspectors, and
officials, and examined records on hundreds of dams.
In my view, the cumulative hazard posed by unsafe dams is huge, but it remains
largely unexplored by the media. When a dam fails - and records suggest dozens
do each year - the events usually are viewed as local, transitory incidents
rather than a symbol of a national problem.
Hurricane Katrina underscored the peril of depending on man-made structures
for protection against disaster. Failure of the New Orleans' levee system
during the storm this year contributed to prolonged flooding and 1,300 deaths.
Months later, as scenes of misery and dislocation lingered in the public mind,
President Bush urgently asked Congress to approve $3 billion for the Army
Corps of Engineers to begin rebuilding New Orleans' battered levees. The House
of Representatives included that amount in a $29 billion hurricane recovery
assistance package it passed three days later.
In concept and construction, levees are close cousins of dams. But while politicians
flocked to support repair of New Orleans' levees, they've virtually ignored
a proposed Dam Rehabilitation and Repair Act which has languished for nearly
a year in a House subcommittee. The proposal would authorize the Federal Emergency
Management Agency (FEMA) to disperse $350 million over four years to help
states repair unsafe dams. Chances of Congress enacting such a repair program
anytime soon are slim.
The $350 million program would be a down payment of less than 10 percent toward
the estimated $36.2 billion total cost of repairing America's unsafe dams.
It also is approximately one-eighth of the amount the president is seeking
for repair of the New Orleans' levees.
This is not to suggest that the New Orleans' levees go unrepaired. But from
New England to Hawaii more and more aging dams are experiencing problems,
with little public awareness. A few large and small examples:
• Taunton, Mass., got national attention in October when a 173-year-old,
12-foot-tall wooden dam above its business district began to buckle. Stores
and schools were closed for a week and townspeople headed for higher ground.
The crisis eased when the water level behind the dam was lowered. The federal
government is now paying 75 percent of the $189,410 cost of tearing down
Whittenton Mills Dam and replacing it with a new one.
• In the placid Schoharie River Valley of upstate New York, a volunteer
group calling itself Dam Concerned Citizens was formed last month to press
for emergency repairs to 182-foot-tall Gilboa Dam, built 80 years ago to
supply drinking water to New York City. The dam has been leaking for years.
Now citizens have established their own website which distributes emergency
notification plans and publicizes preselected evacuation routes for use
should the dam fail (www.gilboadaminfo.com).
• Residents of Denver, Colo., population 2 million plus, were warned
last month by the Corps of Engineers that serious safety problems have been
detected at Cherry Creek Dam, a 141-foot-tall earthen structure. The dam
was built 55 years ago on what was then windswept pastureland 10 miles south
of Denver. Now the dam looms above Interstate 225, a cluster of office parks
and swank homes, a nationally known golf course, and several schools.
Bruce Tschantz, professor emeritus at the University of Tennessee who 25
years ago helped establish the first Office of Dam Safety in the then-nascent
FEMA, reached back into classical mythology to fetch a phrase - "the
sword of Damocles" - to express his concern about the dangers posed by
deficient dams perched above developed areas. (Damocles was a courtier at
the court of Dionysius I in the 4th century BC. He was so gushing in his praise
of the power and happiness of Dionysius that the tyrant, to illustrate the
precariousness of rank and power, gave a banquet and had a sword suspended
above the head of Damocles by a single hair.)
"We know what the problems are, we know where they are, and we know how
to fix them," Dr. Tschantz said in a telephone interview. It's that next
step - actually getting the money to fix them - where we're stalled."
Tschantz doesn't point fingers of blame. But it's clear to me that Congress
and several presidents, including the current occupant of the White House,
share culpability on the national level, and that too many state and local
officials have grown weary of trying to find sources of financing to make
dams safer.
Jimmy Carter was the last president to display serious and sustained interest
in the issue. He had been in office less than a year when, in the early morning
darkness of a Sunday in November 1977, a never-inspected dam in the mountains
of his home state of Georgia collapsed and sent a wall of water crashing down
upon the campus of Toccoa Falls Bible College - a campus he had visited several
times.
The Kelly Barnes Dam on Toccoa Creek dated back to 1899, when a rock-and-
timber structure was built across a fast-flowing mountain stream to impound
water for a small hydroelectric plant. Later, Toccoa Falls Bible Institute
chose the valley below as the site for its campus, took over the power plant
and, in 1937, decided to construct an earthen embankment over the original
dam, eventually raising the structure's height to 42 feet.
Twenty years later, in 1957, the school abandoned the power plant. For the
next two decades, the dam was neglected, visited only by an occasional fisherman
or hiker. Pine trees grew to maturity on its downstream slope, sending roots
deep into the dam's core. Portions of the steep embankment vanished in a landslide,
but there were no repairs, even though water seeped almost continuously from
the base of the dam. Finally, the weakened 78-year-old dam collapsed during
a rainy night in Georgia.
In the valley below, Eldon Elsberry and two friends were on patrol in the
campus fire department's Jeep. When the wall of water hit, it overturned the
vehicle. "One minute the water [in the creek] was inches deep, and the
next I was swimming for my life," Mr. Elsberry said. "I saw the
bank and made for it." He turned and saw one of his friends struggling
in the water. "I reached for his hand. He went by so fast I couldn't
touch him."
Experts later calculated that the water released by the dam's collapse weighed
approximately the same as 7,500 locomotives. As the water crashed across the
campus, it destroyed a dormitory and crushed a cluster of mobile homes where
married students lived.
Later, in the mud and tangled debris, 39 bodies were found. Twenty were children.
College officials said they never hired a private consulting engineer because
they had no idea it had safety problems. The state of Georgia never inspected
the dam because, at the time, there was no state law requiring such inspections.
Few other states had dam safety laws then, either. Pennsylvania was one of
the exceptions. Its tough law was spurred by memories of the 1889 collapse
of South Fork Dam above Johnstown that killed 2,209 people. Yet even with
the strong state law requiring regular safety inspections, another 55 people
in the same community died in July 1977 after the failure of Laurel Run Dam,
just a few miles from where South Fork Dam triggered the disaster 88 years
earlier.
While all states except Alabama now have laws or regulations establishing
dam safety programs, enforcement is spotty, largely because of the paucity
of inspectors. In Texas, for example, there are only six state employees to
inspect nearly 7,500 dams. One Texas official noted that with the current
staff level "some dams would not be examined for three centuries."
Let's do the math. Two of my teenaged grandchildren live in Texas. If we count
30 years for each generation, that means all the dams in Texas will be inspected
by the time my grandchildren's great-great-great-great-great-great-great-great-great-grandchildren
ring in a new year in 2306. Reassuring, isn't it?
• Gaylord Shaw won a Pulitzer Prize for a series investigating the state
of the nation's dams for the Los Angeles Times in 1978.
JUNE 1999:
ONE OF CENTRAL OREGON'S DAMS COULD COLLAPSE IN A MODERATE EARTHQUAKE, prompting
federal officials to warn people immediately below Wickiup Reservoir to flee
to higher ground at the first sign of ground movement. "If people can
feel an earthquake in the area, it's probably going to be strong enough to
do something to the dam," said Larry Wolf, dam safety expert with the
U.S. Bureau of Reclamation in Boise.
It is the first time in the Northwest that the bureau has advised residents
to evacuate as standard practice during an earthquake. "Certainly we
don't want to create panic, but we want people to be aware," he said.
The dam is about 20 miles [32 kilometers] south of Bend and much closer to
a number of upscale developments, including Sunriver, which can be packed
with 20,000 people on a summer day.
The bureau estimates that floodwaters could endanger roughly 10,000 people.
However, Wolf said there would be time for most people to evacuate. The flooded
area would roughly follow the channel of the Deschutes River, extending beyond
the banks for more than a mile in some places, he said. Because the river
channel flattens in some developed areas, floodwaters would take about 14
hours to reach Bend, he said. An earthquake with a magnitude of 5.0 on the
Richter scale could cause a catastrophic failure of the 2-mile-long earthen
dam. However, he said the chances of such an earthquake are estimated to be
about one-tenth of 1 percent each year. Wolf characterized the risk as remote
but real. P The Klamath Falls earthquakes in 1993 were pegged at magnitudes
of 5.6 and 6.0, and the Scotts Mills earthquake earlier that year in the Willamette
Valley hit 5.6.
Wolf said data collected at the dam in recent years indicated that the saturated
silt and ash layers of earth beneath the dam could liquefy during an earthquake.
The dam was completed in 1949 and holds up to 200,000 acre feet of water,
or enough water to cover 200,000 acres to a depth of one foot. The water is
used primarily for irrigation in Jefferson County. Wolf said reclamation engineers
have suspected for years that Wickiup Dam was at risk. Those fears were confirmed
with additional analysis and testing last year. In February, the bureau decided
it needed to warn local authorities and the public about the situation and
to undertake a $40 million renovation project.
Jim Mumford, who heads the bureau's dam safety division in Boise, said these
are far more specific warnings than the bureau has ever issued to Pacific
Northwest communities. For example, when the Ochoco Dam near Prineville was
at some risk of failing several years ago, the bureau told residents to contact
local emergency service officials if there was a problem with the dam. But
with Wickiup, he said, there won't be time to await instructions from officials.
"This is the first time where we're saying, 'Don't wait for notification.
The earthquake is the notification,' " he said. The bureau also has designated
escape routes, then posted fliers and sent brochures to area homeowners with
maps of those routes. Larry Zakrajsek, who does risk analysis for the bureau,
said the agency did not rush to warn people partly because the danger is small
and the dam has functioned well for 50 years.
By Gordon Gregory, Correspondent, The Oregonian The Spring Break Quake of
1993, which rattled buildings across western Oregon and caused $30 million
in damage, was a harbinger of an 8 or 9 magnitude quake that is in Oregon's
future, geologist Donald Hull tells legislators. "It's been 299 years
since the last such event," Hull said. "The window of vulnerability
is open again." Hull, who is Oregon's chief state geologist, hopes the
Legislature will set aside money for better mapping of earthquake hazard zones
and for public safety campaigns to let people know what to do when the Big
One hits.
The department has been able to retrofit about 60 bridges since the Spring
Break quake, but ODOT estimates that at least 1,500 other bridges in western
Oregon are in need of at least some earthquake strengthening. Frank Nelson,
ODOT's bridge preservation engineer, said eight more bridge projects are planned,
and that the department might be able to do an additional four if lawmakers
approve a gas tax increase for road repairs. Those projects should at least
be enough to keep Interstate 5 -- Oregon's main north-south lifeline -- open
in the event of a major earthquake, Nelson said.
Scientific evidence shows that major offshore earthquakes occur off Oregon's
coast once every 350 to 500 years. The last one, in 1700, drowned coastal
forests and sent tsunami waves across the Pacific so powerful that they destroyed
Japanese fishing villages. Such a quake would not only devastate Oregon coastal
communities, but inland areas as well. "The Willamette Valley is a big
trough full of loose soils, gravel, sands and silts," he said. "When
earthquake waves travel through that kind of sediment, they get bigger; they
amplify. I'm just praying it won't happen in my lifetime."
Senate President Brady Adams said lawmakers are aware that Oregon is due for
another huge earthquake. "It's hard to define in a specific time frame
what the risk is. Is it going to happen tomorrow, or 200 years from now?"
the Grants Pass Republican said. "There's no question the threat of earthquakes
is real, but we also know we have school funding and other needs that are
before us today."
Hull said he can't argue with that logic, but still thinks the Legislature
should consider increasing at least to a small degree its financial commitment
to preparing the state for the Big One. "There's nothing else in our
foreseeable future that's going to be as devastating," the state geologist
said. "It's not going to do us any good to fund education programs if
the school buildings end up falling on kids' heads."